Energy, storage, and data centers: Projects that turn on a local or state approval.

Solar, battery storage, and data center projects in the San Joaquin Valley run through county permits or the California Energy Commission, utility interconnection rules, and new state laws on power, water, and disclosure. DBMAC maps that path, prepares the record and the hearings, and builds the local support a project needs, alongside your engineers and attorneys.

An energy project is approved in public, on a record. Developers who build that record early give themselves the best chance at a decision on schedule.

A Valley energy or data center project usually needs several public decisions at once: a land use approval, environmental review, a utility answer on power, and sometimes a state certificate. Each runs on its own calendar, and each body reads the others' record.

The work here is to put those decisions in order, prepare what each one needs, and bring the people and agencies who will be asked about the project into the conversation before the hearing, not at it.

Four decisions

Who decides each step, and how we help.

  1. 01

    County permit or the California Energy Commission

    Who decides. A county or city conditional use permit with its own environmental review, or, for eligible solar, wind, storage, and clean energy manufacturing projects, the Energy Commission's opt-in certification under AB 205, with a 270-day review once an application is complete.

    What DBMAC does. We compare the two paths for your site: which bodies decide, what each will ask for, where the schedule is most exposed, and what local engagement each still needs.

  2. 02

    Power: utility interconnection and large loads

    Who decides. Decided by the utility under tariffs the California Public Utilities Commission approves. In PG&E territory, interim Electric Rule 30 governs customers served at transmission voltage, including large data center loads.

    What DBMAC does. We follow the CPUC record for you, prepare comments where they matter, and line up the local approvals that have to move alongside the utility work.

  3. 03

    New state rules for data centers

    Who decides. Seven bills signed September 21, 2026 set new rules on electricity tariffs, water use disclosure, energy reporting, and environmental review for data center projects, with much of the detail still to be set by the CPUC.

    What DBMAC does. We track the rulemakings that implement the laws, explain what your application must now disclose, and prepare you for the questions planning staff and commissions will ask.

  4. 04

    Farmland, land use screens, and neighbors

    Who decides. Decided by the county board and planning commission for each site, with state planning maps such as the Energy Commission's land use screens shaping where resources are studied, and Williamson Act contracts on many Valley parcels.

    What DBMAC does. We map the approval path for the site, organize outreach to neighbors, districts, and growers before the hearing, and help you build a record that answers farmland and water questions directly.

Plain limits

What stays with your engineers and attorneys.

  • DBMAC is not a law firm or an engineering firm. Permit law, contracts, and interconnection studies stay with your attorneys and engineers; we work alongside them.
  • DBMAC does not speak for any public agency and acts for one only under a written engagement with it. Daron has served on the Merced County Board of Supervisors and other public bodies, so any matter before, or likely to come before, a body on which he holds or has held a seat is reviewed for conflicts before any substantive conversation. See his seats.

How engagements work

How an engagement runs.

An engagement can cover one site, one approval path, or one utility question. Developers with several projects in the state can keep DBMAC on retainer instead.

  1. 1

    A free first conversation

    Tell us what needs approving. The first conversation covers whether it is achievable, how long it realistically takes, and who has to say yes, and it is free.

  2. 2

    Path and plan

    A written map of the approvals, bodies, calendars, and people, with the risks ranked and a sequence to follow.

  3. 3

    Execution

    Preparation for agency meetings, submittal follow-up, coalition building, and hearing preparation, run alongside your team and your attorneys.

  4. 4

    Through the vote and after

    Conditions, continuances, and follow-up items are tracked to closure, and the next approval is lined up before the gavel comes down.

Start here

Planning an energy or data center site?

Tell us the site and the timeline. The first conversation is free and confidential. We will talk through the approval path, the timing, and who has to say yes.

CallRequest a consultation