Insights topic

Data Centers

Data center development in California: siting, large-load utility tariffs and power availability, water use, and the local permitting and land use approvals that decide whether a campus moves forward.

Start here

A data center is approved mainly at the local level, with state agencies involved through its power supply. The California Energy Commission does not permit data centers, but it has jurisdiction over certain energy infrastructure associated with them because it certifies all thermal generating facilities of 50 MW and larger, which can include large backup generator fleets. Through the Small Power Plant Exemption process, facilities between 50 and 100 MW can obtain an exemption from CEC jurisdiction and proceed with local permitting. One Kern County example is the RB Inyokern Data Center in the unincorporated community of Inyokern, whose application describes forty diesel generator sets providing up to 99 MW of backup emergency generation.

Utility service is a separate approval track. On July 24, 2025, the CPUC approved an interim electric rule to speed transmission-level grid connections for high-energy users in PG&E's service territory; the interim rule is available only to applicants that agree to pay upfront for necessary transmission work. Generators and other emission units also need air permits, and the Valley Air District handles Authority to Construct applications in its region.

Local approvals also bring environmental review. CEQA generally requires state and local agencies to inform decision makers and the public about a proposed project's potential environmental impacts. Before buying land, a sponsor should confirm the lead agency, the total generator capacity and the utility service path.

First steps

  1. Total the planned backup generation capacity before choosing a permitting path.
  2. Open a service request with the serving utility as early as possible.
  3. Confirm the city or county lead agency and its CEQA expectations before site control.

Articles

On Policy Watch

Rules and laws to track.

  1. New lawData Centers

    AB 2469: Water-use conditions on local permits for data centers

    Cities and counties; local water suppliers AB 2469 (Ch. 436, Stats. 2026)

    Status: Signed Sept. 21, 2026; chaptered

    Next: Water scarcity plan required before local approval of data center permits beginning Jan. 1, 2028

  2. New lawData Centers

    SB 886: Technology Innovation and Ratepayer Protection Act (data center tariffs)

    California Public Utilities Commission SB 886 (Ch. 438, Stats. 2026)

    Status: Signed Sept. 21, 2026; chaptered

    Next: CPUC to establish new tariffs or update electric rules for participating data center customers by Jan. 1, 2028

  3. New lawData Centers

    SB 887: CEQA categorical exemptions barred for data centers; ELDP path

    Lead agencies; Office of Land Use and Climate Innovation SB 887 (Ch. 439, Stats. 2026)

    Status: Signed Sept. 21, 2026; chaptered

    Next: LCI, with the CEC, to develop uniform statewide standards for data center ELDP certification

  4. ProceedingData Centers

    CPUC Advanced Electric Rate Design rulemaking: data center tariff track

    California Public Utilities Commission R.26-04-009

    Status: Active; scoping memo issued Sept. 22, 2026 with Track 1 on data center tariffs

    Next: Ruling with staff proposal on data center tariff (Q1 2027); proposed decision (Q2 2027)

Everything on Policy Watch for this topic

Start here

Have a project in this area? Start with a free first conversation.

DBMAC's economic development work starts with a free first conversation about what is achievable, how long it takes, and who has to say yes.

CallRequest a consultation