Energy and Utilities

California energy decisions that shape where projects can be built and connected: CAISO transmission planning and interconnection, CPUC proceedings, California Energy Commission permitting, storage, solar, geothermal, hydrogen, offshore wind, and utility wildfire mitigation plans.

Start here

Energy oversight in California is split among several bodies. The California Public Utilities Commission regulates privately owned electric and natural gas companies. The California Independent System Operator manages the flow of electricity across high-voltage, long-distance power lines, operates the wholesale energy market and oversees transmission planning. The California Energy Commission is the state's primary energy policy and planning agency.

Siting depends on the type and size of the facility. The CEC has exclusive authority to license thermal power plants of 50 MW or larger, along with related transmission and fuel lines, and its certificate is in lieu of most state, local and regional permits. That jurisdiction does not cover hydroelectric, solar photovoltaic or onshore wind plants. Certain clean energy projects can instead use Opt-in Certification, a consolidated state permitting option created by AB 205 (2022), under which the CEC decides within 270 days of a complete application. Grid connection is a separate track: transmission-level projects follow CAISO procedures, starting with an Interconnection Request, while distribution-level resources follow their utility's procedures.

Air permits are local. In the San Joaquin Valley, the Valley Air District regulates stationary sources, while the Air Resources Board sets state standards and oversees local actions. A sponsor should settle the permitting path, the interconnection route and the air district's role before committing to equipment or a schedule.

First steps

  1. Confirm whether the project falls under CEC jurisdiction or local permitting.
  2. Decide early whether interconnection runs through CAISO or the local utility.
  3. Meet the local air district before finalizing equipment choices.

Articles

On Policy Watch

Rules and laws to track.

  1. Plan or programEnergy and UtilitiesComments due Dec 4, 2026

    CAISO 2026-2027 Transmission Planning Process

    California Independent System Operator (CAISO)

    Status: Study phase; final reliability study results posting scheduled Oct. 30, 2026; preliminary policy and economic study results Nov. 16, 2026

    Next: Stakeholder meeting Nov. 18, 2026; comments due Dec. 4; draft plan posting Mar. 31, 2027 (dates marked with an asterisk on CAISO's schedule)

  2. New lawEnergy and Utilities

    SB 1196: CPUC timelines for small energization projects

    California Public Utilities Commission SB 1196 (Ch. 684, Stats. 2026)

    Status: Signed; chaptered Sept. 27, 2026

    Next: CPUC to set utility response and processing timelines for small energization requests

  3. New lawEnergy and Utilities

    AB 2493: CPUC transmission development monitor for interconnection upgrades

    California Public Utilities Commission AB 2493 (Ch. 944, Stats. 2026)

    Status: Signed; chaptered Sept. 30, 2026

    Next: CPUC to establish a transmission development monitor by Oct. 1, 2027

Everything on Policy Watch for this topic