SGMA compliance in the San Joaquin Valley now looks different from basin to basin. Some subbasins are on state probation, with well-by-well reporting and fees. Others were returned to DWR’s oversight after revising their plans. At least one, the Merced Subbasin, has a resubmittal deadline in 2027. This guide explains how the Sustainable Groundwater Management Act works, where Valley basins stand as of October 2026, and what each status means for growers, landowners, and the agencies that manage groundwater.
How SGMA works
The Legislature adopted the Sustainable Groundwater Management Act in 2014. It puts local agencies in charge first. In high- and medium-priority basins, local agencies form groundwater sustainability agencies (GSAs), which can be water districts, counties, irrigation districts, cities, or other local government entities, and those GSAs write and carry out groundwater sustainability plans (GSPs).
Plans are measured against six effects the State Water Board calls sustainability indicators: chronic lowering of groundwater levels, reduction of storage, seawater intrusion, degraded water quality, land subsidence, and depletion of interconnected surface water. Critically overdrafted basins must reach sustainability by 2040, and the remaining high- and medium-priority basins have a 2042 deadline.
GSAs have their own tools. State law allows a GSA to impose fees, including permit fees and fees on groundwater extraction, after a public meeting, and a GSA can require meters through its plan, with the well owner paying for the meter. Many growers will deal with their local GSA’s rules and fees long before they ever deal with the state.
How state intervention works
The Department of Water Resources (DWR) reviews each plan. If DWR finds a plan incomplete, the GSAs get an additional 180 days to cure the deficiencies. If they are not cured, DWR can find the plan inadequate, and the basin moves to the State Water Board, which serves as the state’s backstop.
The Board describes intervention as additional to local management and intended to be temporary. The sequence runs in stages:
- Probationary hearing. After notice and a public hearing, the Board may designate a high- or medium-priority basin probationary. The designation can exclude pumpers whose extractions are adequately managed locally or are likely to have a minimal impact.
- Time to correct. An interim plan cannot be put in place until GSAs have had at least one year to correct their deficiencies.
- Interim plan. If deficiencies remain, the Board may adopt an interim plan after another hearing. State law allows an interim plan to include restrictions on groundwater extraction, along with corrective actions, a schedule, and monitoring.
- Return to DWR. Once GSAs resolve the issues, the Board can return the basin to DWR’s jurisdiction.
Where San Joaquin Valley basins stand
The State Water Board’s groundwater basins page lists two basins on probation (Tulare Lake and Tule), one under evaluation for a potential probationary designation (Pleasant Valley), and four returned to DWR (Chowchilla, Delta-Mendota, Kaweah, and Kern County).
- Tulare Lake Subbasin: designated probationary on April 16, 2024. Litigation is ongoing. On August 12, 2026, the trial court issued a limited preliminary injunction covering only the Tri-County Water Authority GSA and Southwest Kings GSA territories while the case is pending. The Board states that all other areas remain subject to probationary requirements.
- Tule Subbasin: designated probationary at a public hearing on September 17, 2024. On April 21, 2026, the Board adopted a resolution denying probationary reporting and fee exclusions requested by eight Tule GSAs.
- Chowchilla Subbasin: the Board determined on June 3, 2025 that a probationary designation was not necessary.
- Delta-Mendota Subbasin: the Board acted on April 7, 2026 to return the subbasin to DWR’s jurisdiction.
The Merced Subbasin
On October 8, 2026, DWR determined that the Merced Subbasin plan is incomplete. The plan was submitted by the Merced Irrigation-Urban GSA, the Merced Subbasin GSA, and the Turner Island Water District GSA. DWR’s findings center on land subsidence: the department found the plan did not provide sufficient information to support its sustainable management criteria for subsidence. The GSAs must address the deficiencies and resubmit no later than April 6, 2027. If they are not addressed, DWR, after consultation with the State Water Board, may determine the plan inadequate, which is the step that opens the state intervention process described above.
What probation means for well owners
In a probationary basin, the obligations shift from the GSA to the individual pumper. According to the Board’s reporting and fees page:
- Measuring begins 90 days after the Board decides, at a public hearing, to put a basin on probation.
- Annual reports are filed online through the Board’s GEARS system and include well location, well capacity, and monthly extraction volumes, among other details. Pumpers who do not receive a notification letter are still required to report if the rules apply to them.
- Fees are a $300 per well annual base filing fee plus $20 per acre-foot extracted in probationary basins. Where the Board determines an interim plan is required, the volumetric rate is $35 per acre-foot.
- Late fees accrue automatically at 25 percent per month, up to three times the annual fee, for reports not filed within 30 days after the deadline.
- Fee waivers are available for certain low-income residents, certain water systems serving disadvantaged communities, and public schools.
Basin-specific rules matter as much as the statewide table. In both Tule and Tulare Lake, the Board in April 2026 excluded small pumpers using 20 acre-feet per year or less, with conditions. In Tulare Lake, the exclusion applies to pumpers who also do not export groundwater outside the subbasin. In Tule, the exclusion does not cover wells within 2 miles of the Friant-Kern Canal, an area with its own metering requirements. Domestic users who pump two acre-feet or less per year are de minimis extractors under the statute; whether they report in a probationary basin is decided basin by basin at a Board hearing.
Funding for GSAs and land repurposing
Two state programs are moving through public comment this fall:
- Sustainable Groundwater Management Grant Program (DWR). The Proposition 4 round will offer over $300 million across two phases for groundwater sustainability projects. Comments on the draft guideline amendment and proposal solicitation package are accepted through December 4, 2026.
- Multibenefit Land Repurposing Program (Department of Conservation). The program awards block grants to groundwater sustainability agencies and partners to repurpose agricultural land and reduce reliance on groundwater. It has awarded $77 million to date, and the 2024 climate bond authorizes up to $200 million more. The draft guidelines are open for a public review period from October 23 to December 7.
For GSAs and their partners, the comment periods are the point at which program design, eligibility, and scoring can still be shaped. Growers and landowners can see how DBMAC helps owners with GSA rules, probation, and land decisions on its page for landowners; agencies can see how it works on agency process, hearings, and partner alignment on its government relations page.
What to watch
- December 4, 2026: comment deadline on DWR’s draft Proposition 4 groundwater solicitation.
- December 7, 2026: close of the Department of Conservation’s public review of draft land repurposing guidelines.
- February 1: the statutory due date for annual extraction reports in probationary basins, unless a basin page sets a different date. Check the Board’s reporting page and the page for your basin.
- April 6, 2027: resubmittal deadline for the Merced Subbasin plan.
- Tulare Lake litigation and Pleasant Valley: the Board’s Tulare Lake updates page and basin list are where changes in status are posted.

