Policy Watch · checked October 29, 2026
The rules, proceedings, and laws that move California projects.
State and federal rulemakings, regulatory proceedings, and new laws that affect infrastructure, energy, water, land use, and funding in California. Each item shows the next date that matters and links to its official source, which we re-check every week. Facts are reported as published. See what changed this week.
Tracked items
Preview: the first two items for this kind of agency show the sentence of their own summary that says what they mean for an agency like yours. DBMAC Intelligence for Agencies shows it under every item that has one. See DBMAC Intelligence for Agencies.
Showing 30 of 30 items
- RulemakingPermitting and Land UseComments open
CEC emergency rulemaking amending Opt-In Certification Program regulations
California Energy Commission Docket 26-OIR-04
The CEC proposes emergency amendments to its Opt-In Certification Program regulations (Title 20, sections 1875-1882 and Appendix B) to incorporate 2025 statutory changes from SB 254 and SB 283. Changes include the statutory presumption of net economic benefits, new requirements to show property rights and consult the fire suppression authority, revised local agency reimbursement and community benefits agreement procedures.
Status: Proposed emergency regulations released; workshop rescheduled from Oct. 9 to Nov. 2, 2026
Next: Remote workshop Nov. 2, 2026; written comments due Nov. 10, 2026
Who should watch: Clean energy and storage developers and host cities/counties for opt-in projects
Preview: what its summary says for an agency like yours“Changes include the statutory presumption of net economic benefits, new requirements to show property rights and consult the fire suppression authority, revised local agency reimbursement and community benefits agreement procedures.” Quoted from the Policy Watch summary of the official source; confirm there.
Comments dueNov 10, 2026Last checkedOct 29, 2026Related analysis: CEC Opt-In Permitting Process: How AB 205 Certification Works for Clean Energy ProjectsOfficial source for CEC emergency rulemaking amending Opt-In Certification Program regulations (opens in a new tab) One-page sheet for CEC emergency rulemaking amending Opt-In Certification Program regulations Ask DBMAC about CEC emergency rulemaking amending Opt-In Certification Program regulations - Plan or programPublic Funding and Grants
SAFER Drinking Water: FY 2026-27 Fund Expenditure Plan
State Water Resources Control Board
The annual Fund Expenditure Plan sets how the Safe and Affordable Drinking Water Fund, which provides $130 million per year, will be spent on solutions for small water systems out of compliance with drinking water standards. Eligible uses include operations and maintenance, consolidation, replacement water and administrators.
Status: Draft plan out for public comment
Next: Written comments due Oct. 30, 2026 (noon); Board adoption no earlier than Nov. 17, 2026
Who should watch: Small and disadvantaged community water systems, counties and technical assistance providers
- Plan or programTransportation and Infrastructure
2026 Local Partnership Program Competitive (LPP-C) call for projects
California Transportation Commission
The CTC adopted the 2026 Local Partnership Competitive Program Guidelines on Aug. 20, 2026. Project nominations for the 2026 Local Partnership Competitive Program, which covers fiscal years 2027-28 and 2028-29, are due Wednesday, Nov. 18, 2026.
Status: Guidelines adopted Aug. 20, 2026; call for projects open
Next: Project nominations due Nov. 18, 2026
Who should watch: Cities, counties and transportation agencies with LPP-eligible projects
Next dateNov 18, 2026Last checkedOct 29, 2026 - Plan or programEnergy and UtilitiesComments due Dec 4, 2026
CAISO 2026-2027 Transmission Planning Process
California Independent System Operator (CAISO)
CAISO's annual transmission planning process identifies grid limitations and reinforcement projects and produces the ISO Transmission Plan. The 2026-2027 cycle's posted schedule lists a final reliability study results posting on Oct. 30, 2026, a preliminary policy and economic study posting on Nov. 16, a meeting on Nov. 18, comments due Dec. 4, a draft transmission plan posting on Mar. 31, 2027 and a Board of Governors meeting in May 2027; each of these dates carries an asterisk on the schedule.
Status: Study phase; final reliability study results posting scheduled Oct. 30, 2026; preliminary policy and economic study results Nov. 16, 2026
Next: Stakeholder meeting Nov. 18, 2026; comments due Dec. 4; draft plan posting Mar. 31, 2027 (dates marked with an asterisk on CAISO's schedule)
Who should watch: Generation, storage and large-load developers and utilities seeking transmission upgrades
- Federal rulePermitting and Land UseComments open
FCC proposal on historic preservation and ESA review of communications infrastructure
Federal Communications Commission WT Docket No. 25-217
In its proceeding on modernizing its National Environmental Policy Act rules, the FCC seeks additional comment on its National Historic Preservation Act (NHPA) section 106 framework for spectrum licensing and communications infrastructure. It asks whether tower construction tied to spectrum licenses is an undertaking under NHPA or an agency action under the Endangered Species Act, and about efficiencies such as batched tower submissions, faster rebuilds after disasters and clearer timelines for Tribal review.
Status: Proposed rule published Oct. 19, 2026; comment period open
Next: Comments due Nov. 18, 2026; reply comments due Dec. 3, 2026
Who should watch: Broadband and wireless providers, tower developers, tribes and local permitting agencies
Comments dueNov 18, 2026Last checkedOct 29, 2026Official source for FCC proposal on historic preservation and ESA review of communications infrastructure (opens in a new tab) One-page sheet for FCC proposal on historic preservation and ESA review of communications infrastructure Ask DBMAC about FCC proposal on historic preservation and ESA review of communications infrastructure - Plan or programTransportation and Infrastructure
2026 Solutions for Congested Corridors Program (SCCP) call for projects
California Transportation Commission
The CTC adopted 2026 SCCP guidelines on Aug. 20, 2026 and set a Nov. 19, 2026 deadline for project nominations. The 2026 program will program two years of funding in fiscal years 2027-28 and 2028-29.
Status: Guidelines adopted Aug. 20, 2026; call for projects open
Next: Project nominations due Nov. 19, 2026
Who should watch: Regional transportation agencies and Caltrans districts with multimodal corridor projects
Next dateNov 19, 2026Last checkedOct 29, 2026Related analysis: SB 1 Cycle 5 Guidelines: What the August 20 Adoption Means for SCCP, TCEP and LPP ApplicantsOfficial source for 2026 Solutions for Congested Corridors Program (SCCP) call for projects (opens in a new tab) One-page sheet for 2026 Solutions for Congested Corridors Program (SCCP) call for projects Ask DBMAC about 2026 Solutions for Congested Corridors Program (SCCP) call for projects - Plan or programTransportation and Infrastructure
2026 Trade Corridor Enhancement Program (TCEP) call for projects
California Transportation Commission
The 2026 TCEP will program two years of funding in fiscal years 2027-28 and 2028-29, estimated at $1,287,958,000. Nominated projects must be in a currently adopted regional transportation plan; staff recommendations are scheduled for June 2027 and program adoption for June 24-25, 2027.
Status: Guidelines adopted Aug. 20, 2026; call for projects open
Next: Project nominations due Nov. 20, 2026; program adoption scheduled June 24-25, 2027
Who should watch: Regional agencies, ports, counties and Caltrans districts with freight corridor projects
Next dateNov 20, 2026Last checkedOct 29, 2026Related analysis: SB 1 Cycle 5 Guidelines: What the August 20 Adoption Means for SCCP, TCEP and LPP ApplicantsOfficial source for 2026 Trade Corridor Enhancement Program (TCEP) call for projects (opens in a new tab) One-page sheet for 2026 Trade Corridor Enhancement Program (TCEP) call for projects Ask DBMAC about 2026 Trade Corridor Enhancement Program (TCEP) call for projects - Plan or programTransportation and Infrastructure
2027 Active Transportation Program (Cycle 8) statewide and small urban/rural awards
California Transportation Commission
The 2027 ATP will program projects in fiscal years 2027-28 through 2030-31. Under the adopted guidelines, staff recommendations for the Statewide and Small Urban and Rural components are scheduled for Nov. 2, 2026 and program adoption for Dec. 3-4, 2026, with the MPO component following in 2027.
Status: Applications closed June 22, 2026; staff recommendations scheduled Nov. 2, 2026
Next: Commission adoption of Statewide and Small Urban and Rural components Dec. 3-4, 2026
Who should watch: Cities, counties, schools and tribes with bike, pedestrian and Safe Routes applications
Next dateDec 3, 2026Last checkedOct 29, 2026Related analysis: AB 2168 Signed: How the Active Transportation Program Rules Change for ATP ApplicantsOfficial source for 2027 Active Transportation Program (Cycle 8) statewide and small urban/rural awards (opens in a new tab) One-page sheet for 2027 Active Transportation Program (Cycle 8) statewide and small urban/rural awards Ask DBMAC about 2027 Active Transportation Program (Cycle 8) statewide and small urban/rural awards - Plan or programWaterComments open
DWR Sustainable Groundwater Management Grant Program: draft 2026 guidelines and PSP
California Department of Water Resources
On Oct. 5, 2026, DWR released the Draft 2026 Sustainable Groundwater Management (SGM) Grant Program Guideline Amendment and a Draft 2026 Proposal Solicitation Package (PSP) for public comment. DWR is holding a general public comment workshop on Nov. 5, 2026 and a Tribal comment workshop on Nov. 17, 2026. Written comments are accepted from Oct. 5 through Dec. 4, 2026 at FinancialAssistance@water.ca.gov.
Status: Draft 2026 guideline amendment and proposal solicitation package out for public comment
Next: General public comment workshop Nov. 5, 2026; Tribal workshop Nov. 17; written comments due Dec. 4, 2026
Who should watch: Groundwater sustainability agencies, counties and water districts in SGMA basins
Comments dueDec 4, 2026Last checkedOct 29, 2026Official source for DWR Sustainable Groundwater Management Grant Program: draft 2026 guidelines and PSP (opens in a new tab) One-page sheet for DWR Sustainable Groundwater Management Grant Program: draft 2026 guidelines and PSP Ask DBMAC about DWR Sustainable Groundwater Management Grant Program: draft 2026 guidelines and PSP - Plan or programAgriculture and the Central ValleyComments open
Multibenefit Land Repurposing Program: draft guidelines for $200M in Climate Bond funds
California Department of Conservation
The Department of Conservation released draft guidelines for updating the Multibenefit Land Repurposing Program (MLRP) to administer $200 million from the 2024 Climate Bond. MLRP supports regional efforts to repurpose agricultural land to reduce reliance on groundwater. The 45-day public review period runs Oct. 23 to Dec. 7, with a concurrent 60-day tribal consultation period through Dec. 22; written comments go to mlrp@conservation.ca.gov.
Status: Draft guidelines released for 45-day public review (Oct. 23 to Dec. 7)
Next: Public workshops Nov. 4 and Nov. 16, 2026; public review period ends Dec. 7, 2026
Who should watch: Groundwater sustainability agencies, landowners and growers in overdrafted basins
Comments dueDec 7, 2026Last checkedOct 29, 2026Official source for Multibenefit Land Repurposing Program: draft guidelines for $200M in Climate Bond funds (opens in a new tab) One-page sheet for Multibenefit Land Repurposing Program: draft guidelines for $200M in Climate Bond funds Ask DBMAC about Multibenefit Land Repurposing Program: draft guidelines for $200M in Climate Bond funds - Plan or programPublic Funding and Grants
CEC Food Production Investment Program 2026 grant solicitation (GFO-26-302)
California Energy Commission GFO-26-302
The California Energy Commission's Food Production Investment Program 2026 solicitation will fund the implementation and demonstration of advanced energy and decarbonization technologies in food processing and supporting facilities. The solicitation was released Sept. 14, 2026, and applications are due Dec. 17, 2026 at 11:59 p.m.
Status: Solicitation released Sept. 14, 2026; applications open
Next: Applications due Dec. 17, 2026, 11:59 p.m.
Who should watch: Food processors and agricultural processing facilities
Next dateDec 17, 2026Last checkedOct 29, 2026Official source for CEC Food Production Investment Program 2026 grant solicitation (GFO-26-302) (opens in a new tab) One-page sheet for CEC Food Production Investment Program 2026 grant solicitation (GFO-26-302) Ask DBMAC about CEC Food Production Investment Program 2026 grant solicitation (GFO-26-302) - New lawData Centers
AB 2469: Water-use conditions on local permits for data centers
Cities and counties; local water suppliers AB 2469 (Ch. 436, Stats. 2026)
AB 2469 bars a city or county from approving a permit or entitlement for construction of a data center, or an expansion that increases maximum peak water use, unless specified conditions are met, including a water scarcity plan and a water supply assessment. The water scarcity plan requirement begins Jan. 1, 2028, and the applicant must assume the full cost of any water conveyance, treatment, storage or distribution improvements needed to serve the project.
Status: Signed Sept. 21, 2026; chaptered
Next: Water scarcity plan required before local approval of data center permits beginning Jan. 1, 2028
Who should watch: Cities, counties and water suppliers reviewing data center proposals; data center developers
Preview: what its summary says for an agency like yours“AB 2469 bars a city or county from approving a permit or entitlement for construction of a data center, or an expansion that increases maximum peak water use, unless specified conditions are met, including a water scarcity plan and a water supply assessment.” Quoted from the Policy Watch summary of the official source; confirm there.
Takes effectJan 1, 2027Last checkedOct 29, 2026 - New lawData Centers
SB 886: Technology Innovation and Ratepayer Protection Act (data center tariffs)
California Public Utilities Commission SB 886 (Ch. 438, Stats. 2026)
SB 886 requires the CPUC, by Jan. 1, 2028, to establish new tariffs or update electric rules for interconnection and retail service to participating customer facilities, and to ensure those tariffs prevent stranded costs or cost shifts to other customers. It allows an electrical corporation to file an exceptional case contract for a transmission-level data center seeking service after Jan. 1, 2027 but before the tariff is approved.
Status: Signed Sept. 21, 2026; chaptered
Next: CPUC to establish new tariffs or update electric rules for participating data center customers by Jan. 1, 2028
Who should watch: Data center developers, utilities, and agencies hosting large-load projects
Takes effectJan 1, 2027Last checkedOct 29, 2026Official source for SB 886: Technology Innovation and Ratepayer Protection Act (data center tariffs) (opens in a new tab) One-page sheet for SB 886: Technology Innovation and Ratepayer Protection Act (data center tariffs) Ask DBMAC about SB 886: Technology Innovation and Ratepayer Protection Act (data center tariffs) - New lawData Centers
SB 887: CEQA categorical exemptions barred for data centers; ELDP path
Lead agencies; Office of Land Use and Climate Innovation SB 887 (Ch. 439, Stats. 2026)
SB 887 defines data center for CEQA purposes and prohibits applying a categorical exemption to a project to develop and operate a data center. It authorizes the Governor to certify qualifying data center projects, and geothermal powerplants, as environmental leadership development projects, and directs the Office of Land Use and Climate Innovation to develop uniform statewide standards for the data center conditions.
Status: Signed Sept. 21, 2026; chaptered
Next: LCI, with the CEC, to develop uniform statewide standards for data center ELDP certification
Who should watch: Lead agencies and data center developers planning environmental review
Takes effectJan 1, 2027Last checkedOct 29, 2026 - ProceedingWaterDelta
Delta Conveyance Project water right change petitions hearing
State Water Resources Control Board, Administrative Hearings Office Permits 16478, 16479, 16481, 16482
The Administrative Hearings Office is hearing DWR's petitions to add two new points of diversion and rediversion on the Sacramento River in the northern Delta to four DWR water right permits for the Delta Conveyance Project. The hearing record will inform whether the State Water Board approves the petitions and on what terms; an Oct. 7, 2026 ruling set closing and reply brief deadlines, and an Oct. 13 notice set a status conference for Oct. 19, 2026.
Status: Evidentiary hearing concluded Sept. 3, 2026; briefing phase; AHO calendar listed a status conference Oct. 19, 2026
Next: Closing briefs due Jan. 13, 2027; reply briefs Feb. 12, 2027; supplemental joint conference statements Mar. 25, 2027
Who should watch: SWP contractors, Delta water agencies and north Delta landowners
Next dateJan 13, 2027Last checkedOct 29, 2026 - ProceedingPublic Funding and Grants
CEC Distributed Electricity Backup Assets grant solicitation (GFO-26-503)
California Energy Commission GFO-26-503
The CEC is offering up to $46,144,000 through the Distributed Electricity Backup Assets Program for new distributed energy resources that increase supply or reduce or shift load to improve grid reliability. Applications are submitted through the CEC's new ECAMS portal.
Status: Solicitation released Oct. 23, 2026
Next: Pre-application workshop Nov. 5; questions due Nov. 13, 2026; applications due Jan. 26, 2027
Who should watch: Public agencies, water utilities and businesses planning backup generation, storage or load flexibility
Next dateJan 26, 2027Last checkedOct 29, 2026 - Plan or programHigh-Speed RailSan Joaquin Valley
High-Speed Rail Authority 2027 Project Update Report to the Legislature
California High-Speed Rail Authority Pub. Util. Code §185033.5
State law requires the High-Speed Rail Authority to submit a project update report on the development and implementation of high-speed train service, including a programwide summary and segment-level detail, to the Legislature's budget and policy committees every two years. The state's agency-reports listing shows the next report due March 1, 2027, and the Authority told CalMatters it plans to provide project cost and schedule updates in March.
Status: Biennial report; next report listed as due March 1, 2027
Next: Authority submits Project Update Report with cost and schedule updates
Who should watch: Central Valley local governments, contractors and landowners along the Merced-Bakersfield segment
Next dateMar 1, 2027Last checkedOct 29, 2026Related analysis: High-Speed Rail Heavy Maintenance Facility: The Fresno and Hanford SitesOfficial source for High-Speed Rail Authority 2027 Project Update Report to the Legislature (opens in a new tab) One-page sheet for High-Speed Rail Authority 2027 Project Update Report to the Legislature Ask DBMAC about High-Speed Rail Authority 2027 Project Update Report to the Legislature - New lawEnergy and Utilities
SB 1196: CPUC timelines for small energization projects
California Public Utilities Commission SB 1196 (Ch. 684, Stats. 2026)
SB 1196 requires the CPUC, by Sept. 30, 2027, in a new or existing proceeding, to establish timelines for electrical corporations to respond to and process requests to energize small energization projects. It builds on the Powering Up Californians Act's energization timing requirements.
Status: Signed; chaptered Sept. 27, 2026
Next: CPUC to set utility response and processing timelines for small energization requests
Who should watch: Developers, public agencies and businesses waiting on new or upgraded electric service connections
- New lawEnergy and Utilities
AB 2493: CPUC transmission development monitor for interconnection upgrades
California Public Utilities Commission AB 2493 (Ch. 944, Stats. 2026)
AB 2493 requires the CPUC to establish a transmission development monitor by Oct. 1, 2027, to review large utilities' and transmission owners' progress on network upgrades approved in CAISO transmission plans or generator interconnection agreements. Utilities and transmission owners assigned such projects must submit project-specific schedules to the monitor, and the CPUC must act on material deficiencies the monitor identifies.
Status: Signed; chaptered Sept. 30, 2026
Next: CPUC to establish a transmission development monitor by Oct. 1, 2027
Who should watch: Generators, storage developers and large loads waiting on utility network upgrades
Next dateOct 1, 2027Last checkedOct 29, 2026Official source for AB 2493: CPUC transmission development monitor for interconnection upgrades (opens in a new tab) One-page sheet for AB 2493: CPUC transmission development monitor for interconnection upgrades Ask DBMAC about AB 2493: CPUC transmission development monitor for interconnection upgrades - New lawAgriculture and the Central Valley
AB 1156: Williamson Act cancellation fees and solar facilities
California Natural Resources Agency; cities and counties AB 1156 (Ch. 875, Stats. 2026)
AB 1156 removes a city's or county's ability to waive or defer Williamson Act cancellation fees and instead lets the Secretary of the Natural Resources Agency do so on a landowner's application, including where cancellation facilitates a qualifying photovoltaic solar facility. Until Jan. 1, 2037, the Secretary must approve qualifying payment-extension applications and waive payment once a solar project is built, and contracts become void when land is approved for a solar facility certified as an environmental leadership project.
Status: Signed; chaptered Sept. 30, 2026
Next: Secretary of Natural Resources to handle cancellation-fee waiver/extension applications
Who should watch: Landowners with Williamson Act contracts, solar developers and county planning departments
What its summary says for an agency like yoursThis item's summary has a line for this kind of agency. DBMAC Intelligence for Agencies shows it here. See the plan
Next dateNone scheduledLast checkedOct 29, 2026Related analysis: Williamson Act Contract Cancellation in California: Nonrenewal, Cancellation, and What Landowners Need Before Converting FarmlandOfficial source for AB 1156: Williamson Act cancellation fees and solar facilities (opens in a new tab) One-page sheet for AB 1156: Williamson Act cancellation fees and solar facilities Ask DBMAC about AB 1156: Williamson Act cancellation fees and solar facilities - New lawAgriculture and the Central Valley
AB 1600: CalEPA review of farmworker communities as disadvantaged communities
California Environmental Protection Agency; OEHHA AB 1600 (Ch. 529, Stats. 2026)
AB 1600 requires CalEPA to assess whether designating farmworker communities as disadvantaged communities would increase their access to investment opportunities, identify barriers low-income farmworker communities face, publish its findings and consider them when identifying disadvantaged communities. CalEPA and OEHHA must also develop a strategy for engaging farmworker communities on environmental, health and socioeconomic burdens.
Status: Signed; chaptered Sept. 27, 2026
Next: CalEPA to assess farmworker communities and publish findings
Who should watch: Rural Central Valley cities, counties and community groups pursuing state climate funds
Next dateNone scheduledLast checkedOct 29, 2026Official source for AB 1600: CalEPA review of farmworker communities as disadvantaged communities (opens in a new tab) One-page sheet for AB 1600: CalEPA review of farmworker communities as disadvantaged communities Ask DBMAC about AB 1600: CalEPA review of farmworker communities as disadvantaged communities - New lawPublic Funding and Grants
AB 1838: Wage and hour violation disclosure for local public works bids
Local agencies awarding public works contracts AB 1838 (Ch. 551, Stats. 2026)
AB 1838 requires contractors bidding on local agency public works contracts to disclose any history of wage and hour violations with supporting documentation, and allows bids lacking the disclosures to be disqualified. Local agencies must establish an appeal process for disqualified bidders; contracts under project labor agreements and projects requiring contractor prequalification are exempt.
Status: Signed; chaptered Sept. 27, 2026
Next: Local agencies to set up a bid-disqualification appeal process
Who should watch: Cities, counties, special districts and contractors bidding public works
Preview: what its summary says for an agency like yours“AB 1838 requires contractors bidding on local agency public works contracts to disclose any history of wage and hour violations with supporting documentation, and allows bids lacking the disclosures to be disqualified.” Quoted from the Policy Watch summary of the official source; confirm there.
What its summary says for an agency like yoursThis item's summary has a line for this kind of agency. DBMAC Intelligence for Agencies shows it here. See the plan
Next dateNone scheduledLast checkedOct 29, 2026 - New lawAgriculture and the Central Valley
AB 2728: Groundwater fee exemptions for de minimis extractors
Groundwater sustainability agencies and local governments AB 2728 (Ch. 963, Stats. 2026)
AB 2728 authorizes a local government, including a groundwater sustainability agency, that imposes a fee or charge for groundwater monitoring or management to exempt de minimis extractors from paying it, upon making specified findings. Existing law already bars GSAs from imposing fees on de minimis extractors unless the agency has regulated them.
Status: Signed; chaptered Sept. 30, 2026
Next: Local agencies may adopt findings to exempt de minimis extractors from groundwater fees
Who should watch: GSAs, rural domestic well owners and SGMA basins in the San Joaquin Valley
Preview: what its summary says for an agency like yours“AB 2728 authorizes a local government, including a groundwater sustainability agency, that imposes a fee or charge for groundwater monitoring or management to exempt de minimis extractors from paying it, upon making specified findings.” Quoted from the Policy Watch summary of the official source; confirm there.
Next dateNone scheduledLast checkedOct 29, 2026 - Federal ruleAgriculture and the Central Valley
Almond marketing order amendment: grower referendum on Almond Board borrowing authority
USDA Agricultural Marketing Service AMS-SC-25-0016
USDA's Agricultural Marketing Service proposes amending Marketing Order No. 981, which regulates the handling of almonds grown in California, to give the Almond Board of California authority to borrow funds from a commercial lending institution. Eligible almond growers will vote in a referendum from Nov. 2 through Nov. 20, 2026 on whether the amendment takes effect.
Status: Proposed amendment published Oct. 8, 2026; grower referendum scheduled
Next: Grower referendum Nov. 2 through Nov. 20, 2026
Who should watch: California almond growers and handlers
Next dateNone scheduledLast checkedOct 29, 2026Official source for Almond marketing order amendment: grower referendum on Almond Board borrowing authority (opens in a new tab) One-page sheet for Almond marketing order amendment: grower referendum on Almond Board borrowing authority Ask DBMAC about Almond marketing order amendment: grower referendum on Almond Board borrowing authority - Plan or programBroadband
CASF Broadband Infrastructure Grant Account: 2026 application deadline extended to Nov. 2
California Public Utilities Commission
The CPUC extended the 2026 application deadline for the California Advanced Services Fund (CASF) Broadband Infrastructure Grant Account from Oct. 1, 2026 to Nov. 2, 2026. The CPUC said the extension responds to stakeholder requests for time to analyze new eligibility data and account for the federal Broadband Equity, Access, and Deployment (BEAD) program.
Status: Application deadline extended from Oct. 1 to Nov. 2, 2026 (CPUC letter of Sept. 21, 2026)
Next: 2026 Infrastructure Account applications due Nov. 2, 2026
Who should watch: Internet service providers, counties and tribes planning broadband infrastructure projects
Next dateNone scheduledLast checkedOct 29, 2026Official source for CASF Broadband Infrastructure Grant Account: 2026 application deadline extended to Nov. 2 (opens in a new tab) One-page sheet for CASF Broadband Infrastructure Grant Account: 2026 application deadline extended to Nov. 2 Ask DBMAC about CASF Broadband Infrastructure Grant Account: 2026 application deadline extended to Nov. 2 - ProceedingData Centers
CPUC Advanced Electric Rate Design rulemaking: data center tariff track
California Public Utilities Commission R.26-04-009
The CPUC opened R.26-04-009 on April 9, 2026 to set advanced electric rate design policy. The Sept. 22, 2026 scoping memo makes data center tariffs and customer protections Track 1, including whether to create a separate customer class and new rates for data centers, with a staff proposal ruling planned for Q1 2027 and a proposed decision in Q2 2027.
Status: Active; scoping memo issued Sept. 22, 2026 with Track 1 on data center tariffs
Next: Ruling with staff proposal on data center tariff (Q1 2027); proposed decision (Q2 2027)
Who should watch: Data center developers, large-load customers, utilities and local economic development agencies
Next dateNone scheduledLast checkedOct 29, 2026 - ProceedingBroadband
California BEAD program moves to grant administration
California Public Utilities Commission Resolution T-17920
NTIA approved California's Broadband Equity, Access, and Deployment (BEAD) Final Proposal on July 17, 2026, covering a $1.86 billion broadband investment. On Sept. 17, 2026 the CPUC approved Resolution T-17920 ratifying the Final Proposal and authorizing implementation, which the CPUC describes as the transition to grant administration.
Status: NTIA approved Final Proposal July 17, 2026; CPUC ratified Sept. 17, 2026
Next: Grant administration and implementation with subgrantees
Who should watch: BEAD subgrantees, ISPs and counties with unserved and underserved locations
Next dateNone scheduledLast checkedOct 29, 2026Related analysis: California BEAD Subgrant Process: Who Could Apply, How Awards Were Scored, and What Comes NextOfficial source for California BEAD program moves to grant administration (opens in a new tab) One-page sheet for California BEAD program moves to grant administration Ask DBMAC about California BEAD program moves to grant administration - Federal rulePermitting and Land Use
EPA/Army supplemental proposal on definition of 'waters of the United States'
U.S. EPA and Department of the Army (Corps of Engineers) FR Doc. 2026-18317 (91 FR 57284)
EPA and the Army published a supplemental notice seeking additional comment on their Nov. 20, 2025 proposal to revise the regulatory definition of 'waters of the United States' under the Clean Water Act after the Supreme Court's 2023 Sackett decision. The agencies said they issued the supplemental notice after considering public comments on the November 2025 proposal, to add regulatory options on certain aspects of it.
Status: Supplemental proposed rule published Sept. 9, 2026; comment period closed Oct. 9, 2026
Next: Final action by EPA and the Army; no date published
Who should watch: Developers, landowners, growers and public agencies with projects affecting waters or wetlands
Next dateNone scheduledLast checkedOct 29, 2026Official source for EPA/Army supplemental proposal on definition of 'waters of the United States' (opens in a new tab) One-page sheet for EPA/Army supplemental proposal on definition of 'waters of the United States' Ask DBMAC about EPA/Army supplemental proposal on definition of 'waters of the United States' - New lawHigh-Speed Rail
SB 1425: High-speed rail operating right-of-way encroachment permit program
California High-Speed Rail Authority SB 1425 (Ch. 713, Stats. 2026)
SB 1425 establishes a permit program, administered by the High-Speed Rail Authority, for encroachments on the Authority's operating right-of-way. Installing or performing an encroachment there without a permit becomes a misdemeanor, civil penalties apply to specified encroachments, and permit fees and penalties are deposited in the High-Speed Rail Property Fund. CalMatters reports it lets the Authority grant permits to utilities, local governments and private developers that want to build on Authority-controlled land.
Status: Signed; chaptered Sept. 27, 2026
Next: Authority to administer new encroachment permit program for its operating right-of-way
Who should watch: Utilities, local governments and developers with facilities crossing or near the HSR right-of-way
Preview: what its summary says for an agency like yours“CalMatters reports it lets the Authority grant permits to utilities, local governments and private developers that want to build on Authority-controlled land.” Quoted from the Policy Watch summary of the official source; confirm there.
What its summary says for an agency like yoursThis item's summary has a line for this kind of agency. DBMAC Intelligence for Agencies shows it here. See the plan
Next dateNone scheduledLast checkedOct 29, 2026Related analysis: High-Speed Rail Right-of-Way Acquisition: What Landowners and Businesses Between Merced and Bakersfield Should KnowOfficial source for SB 1425: High-speed rail operating right-of-way encroachment permit program (opens in a new tab) One-page sheet for SB 1425: High-speed rail operating right-of-way encroachment permit program Ask DBMAC about SB 1425: High-speed rail operating right-of-way encroachment permit program - Plan or programWaterDelta
Sacramento/Delta update to the Bay-Delta Water Quality Control Plan
State Water Resources Control Board
The State Water Board is considering Bay-Delta Plan amendments for the reasonable protection of fish and wildlife in the Sacramento River and its tributaries, the Delta eastside tributaries and the Delta. The amendments would be implemented through a voluntary agreement pathway for specified Healthy Rivers and Landscapes water rights and a regulatory pathway for other water rights.
Status: Board meeting to consider adoption scheduled Oct. 28-29, 2026, continuing Oct. 30 if necessary
Next: Board consideration of adoption of the Sacramento/Delta updates and final Staff Report
Who should watch: Sacramento River and Delta water right holders, irrigation districts and SWP/CVP contractors
Next dateNone scheduledLast checkedOct 29, 2026Related analysis: Bay-Delta Plan Update: What the State Water Board Is Voting On October 28-29Official source for Sacramento/Delta update to the Bay-Delta Water Quality Control Plan (opens in a new tab) One-page sheet for Sacramento/Delta update to the Bay-Delta Water Quality Control Plan Ask DBMAC about Sacramento/Delta update to the Bay-Delta Water Quality Control Plan
DBMAC Intelligence Members can watch any item here and get an email when its status or dates change. See membership · Read a sample briefing
Nothing matches those filters. Clear a filter or search a different word.
Insights by email
The analysis behind these rules, by email.
New Insights analysis when it publishes. Policy Watch itself is checked every week; subscribe to its calendar for every date. One click to change or stop.
Dates calendar
Comment deadlines and hearings in your calendar.
Every dated step on this page, updated weekly.
How we check: every item links to its official source (agency docket or notice, the Legislature's bill page, the Federal Register), and the status and dates are re-read from that source each week. Dates can change; confirm on the source before relying on one.
Start here
A rule is moving that affects your project? The comment period is the moment.
In a free first conversation we look at what the rule would mean for your project, who decides, and whether and how to weigh in before the record closes.
